Watch the construction of 2 different 126m Industrial Wind Turbine Power Plants.

“Gulliver” at the time, the UK’s Largest Industrial Wind Turbine Power Plant at 126m, the same size as each of the 10 proposed for the Lenchwick Industrial Wind Power Plant (aka Lenchwick Windfarm) This monster was completed in January 2006